FFA Project Day 2023

September 2023

Projects:

  1. Install concrete siding on back wall of Sugarpine Cabin (no extra tools needed).

  2. Remove wood siding, install plywood panels at DeBoer Hall (2 cordless drills needed).

  3. Install plywood paneling on back of new stage (2 cordless drills needed).

  4. Power wash cabin heater vents (no extra tools needed).

  5. Windex clean interior and exterior cabin windows (no extra tools needed).

  6. Cut and split firewood (no extra tools needed).

  7. Touch up grounds clean up, large debris collection and piling, including under cabins (no extra tools needed).

  8. Remove cob webs from around exterior of buildings (no extra tools needed).

  9. Dusting and wiping down surfaces in Chance Hall and DeBoer Hall (no extra tools needed).

  10. Power wash and clean DeBoer Hall folding tables and chairs (no extra tools needed).

  11. Remove and wash interior plastic lighting covers in DeBoer Hall (no extra tools needed).

  12. Assemble Drag Leveler (no extra tools needed).

Previous
Previous

Camp Sylvester, Approaching its 100th Anniversary

Next
Next

2023 Camp Readiness Weekend